Goals/2008 ev/Facilities

From Sekhet-Maat Lodge
Arf_2008_ev.jpg
Main Report
The main report submitted to the Electoral College for review.
Goals 2008 ev | 2009 ev
Review the status of 2008 ev goals and find out our plans for 2009 ev.
Financial Supplement
See our December 2008 ev financial report, which includes links to annual statements, dues spectrum and budget analysis for 2008 ev.
Initiation Activity
View our supplemental report on Initiation Activity for 2008 ev.
Ecclesiastical Activity
View our supplemental report on Ecclesiastical Activity for 2008 ev.
Internet Activity
View our supplemental report on Internet Activity for 2008 ev.
All pages related to 2008 ev
See all the pages on this site which are categorized in the year 2008 ev, including monthly financial statements, event registration pages, and more.

Facilities Committee goals of Sekhet-Maat Lodge for the common year 2008 ev

Values

The self creation and manifestation of our Temple.

  • Our central location for members enabling it to be the focal point of our work
  • Our functional and workable kitchen
  • Our ethos of cleanliness
  • Our use of our space for art!
  • Taking on the role of setting the example in the greater OTO community
  • Temple is a dedicated 24/7 single use facilitiy
  • Temple space is open to all membership for private use
  • Multi-use, functional space allows for performing the rituals rightly, with Joy and Beauty
  • Our use of the exterior face and garden to contribute to Beauty of our neighborhood
  • Adequate storage space for general use and initiation equipment
  • Lodge provides incidental supplies such as minor first aid and cosmetics etc., for member use

Vision Statement

The Facilities Committee exists to maintain and improve the utility and beauty of the facility for the purpose of performing the rituals with joy and beauty so that we may promulgate the Law of Thelema.

Goals for 2008 ev

[[Office and Bathroom Refurbishment 2008 ev]]
[[Office and Bathroom Refurbishment 2008 ev]]
[[Office and Bathroom Refurbishment 2008 ev]]
[[Office and Bathroom Refurbishment 2008 ev]]

Goal: Put up black curtain wings, black fabric on partition and replace yellow curtains.

Assigned to: Sr. Kati
Current Status: Goal for 2009 ev
  • Sr. Story is currently working on scheduling this in two parts. First part will be to sew/hang the "wing" curtains. Second part will be to get an approved budget for replacement of yellow curtains and then schedule that.
  • FYI, the budget for replacement of the yellow curtains should only include the hardware, we are recycling black fabric for this, so no need to purchase anything. --Misskim 15:18, 2 May 2008 (EDT)
  • I spoke to Sr. Story a little while ago in regards to this and she said it will be a couple months before she will be able to get to this. --15:18, 6 May 2008 (PST), Fr. אין סוף אור
  • Sr. Story has passed the fabric on to Sr. Kati so that she can complete this for the Lodge instead. --12:41, 16 December 2008 (PST), Fr. אין סוף אור
  • Sr. Kati stated that she will only be able to complete putting up the black curtain wings by the end of this year. The replacement of the yellow curtain will need to go into a goal for next year. --09:17, 17 December 2008 (PST), Fr. אין סוף אור


October, 2008 ev

Goal: Paint kitchen, office, and railings.

Assigned to: Sr. Morgana
Current Status: Complete
  • Discussion with JP and others, Kitchen needs cleaning and NOT repainting. Office and railings of course still do need to be painted.
  • Kitchen walls cleaned.
  • Kitchen Pass-through painted. --Fr. אין סוף אור
  • I need to acquire metal sand paper and paint for the railings then get some volunteers to help paint them. --15:20, 8 March 2008 (PST), Fr. אין סוף אור
  • I acquired materials needed to paint the metal railings and have scheduled the time to do the work on the calendar for July 17th & 18th. --09:31, 5 July 2008 (PST), Fr. אין סוף אור
  • With the help of John, Ivey and Ken, we sanded, primed and painted the metal hand railing which took roughly 22 hours broken up over 7 days. In the process an electric hand sander was purchased and donated to the lodge. Much thanks to everyone who helped with this. There is still a bit of touch up to do after the Open House but there is much of the paint left to do it. --12:38, 4 August 2008 (PST), Fr. אין סוף אור
  • The office and bathroom are both painted. The office has new carpet as well. Excellent work! --17:31, 21 October 2008 (PST), Fr. אין סוף אור
  • Here are photos of the painting project as it was in progress: Office and Bathroom Refurbishment 2008 ev --Fr. ΝΘΛΜΚΜΝΡΓ ☉ in ♑ : ☽ in ♓ : dies ♀ : Anno IVxvi


April, 2008 ev

Goal: Provide storage for lances and swords.

Assigned to: Fr. ΝΘΛΜΚΜΝΡΓ
Current Status: Complete
  • Sr. Story found and implemented the perfect solution: a yard tool rack.

<div style="clear:left;" /></div>


Goal: Provide storage for artwork and change art hanging process (hardware).

Assigned to: Fr. ΝΘΛΜΚΜΝΡΓ
Current Status: Stalled
  • Considering the idea of using the space above the bathroom for storage. This would require putting in a "floor" above the bathroom, and dowels placed vertically. Third-party professional art storage is also a possibility. --Fr. HydraLVX
  • Hanging art will be simple but possibly expensive. A couple of possibilities, wooden molding or a professional gallery hanging system, are being considered. --Fr. HydraLVX
  • I need measurements for the area above the bathroom to determine how much it would cost for wood to put a ceiling on it as well as the dowels for the art storage. --15:23, 8 March 2008 (PST), Fr. אין סוף אור
  • The measurements for the area above the bathroom are 5'x9'x54". I found that they only make 4'x8' boards and a 5'x9' board would be special order. I think that the 4'x8' would work out for our needs though. It costs about $20 for the 4'x8' board, $3.50 per 36" dowel and $1.00 for two double-sided wood screws. The board itself will require a pickup truck or mini-van to pick up. --09:37, 5 July 2008 (PST), Fr. אין סוף אור
  • This goal has bifurcated:
  • Frs. IOI and Pangloss are working on the next steps in the art storage project.
  • Sr. Morgana is working up a budget for art hanging, and this part will be done in conjunction with (or before) painting the office. --Fr. ΝΘΛΜΚΜΝΡΓ 17:59, 6 September 2008 (PDT)
  • We've tabled the hanging hardware for a time when we have more funding. It is not likely to be completed this year. The storage project is still moving forward at this time. --Fr. ΝΘΛΜΚΜΝΡΓ 13:37, 4 November 2008 (PST)
  • Due to budget constraints this project will not be accomplished this year. --12:43, 16 December 2008 (PST), Fr. אין סוף אור


April, 2008 ev

Goal: Frame Tree of Life poster, create Lost & Found sign, and fire/water shelf signs.

Assigned to: Fr. ΝΘΛΜΚΜΝΡΓ
Current Status: Complete
  • Have replaced the poster itself as the old one was marked up and old. In budgeting for matting and frame. Lost and found sign is created, need to hang.
  • I bought a new poster and have given it to Fr. ΝΘΛΜΚΜΝΡΓ for matting and hanging. I will email him today and remind him of this. --Misskim 15:18, 2 May 2008 (EDT)
  • The tree of life poster has been desired in the last couple classes. Based on that, the priority has been escalated. I spoke to Fr. ΝΘΛΜΚΜΝΡΓ and he said he will take care of it soon. --15:26, 8 March 2008 (PST), Fr. אין סוף אור
  • The new tree of life poster has been framed and is hanging in the classroom thanks to Fr. ΝΘΛΜΚΜΝΡΓ. --12:41, 4 August 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


Goal: Replace / improve lighting in temple.

Assigned to: Fr. ΝΘΛΜΚΜΝΡΓ
Current Status: Stalled
  • Electrical considerations: Although there is massive wattage coming into the building, enough to power lights for a rock concert, we are not wired to take advantage of this, at all, and so we sometimes have to be careful not to break a circuit in using kitchen appliances, space heaters, or the like. With the temple lighting in particular, the wattage drawn from the existing fixtures is slightly above what the light switch is designed to handle, so it causes the light switch to produce a bit of heat. --Fr. HydraLVX
  • We are exploring conversion to CFBs, LEDs, or any other low-wattage lighting (see below also), which has the potential to circumvent the need for an electrician. It's important to have a rich spectrum of light though, for the viewing of art inside the Lodge, the comfort of our eyes, and to offset those dreary winter days with no sun. --Fr. HydraLVX
  • This project has been made lowest priority due to the high expense and low availability of funds. It is likely out of reach for this year. --Fr. ΝΘΛΜΚΜΝΡΓ 17:59, 6 September 2008 (PDT)
  • Due to budget constraints this project will not be accomplished this year. --12:45, 16 December 2008 (PST), Fr. אין סוף אור


April, 2008 ev

Goal: Replace / improve sound system.

Assigned to: : Fr. ΝΘΛΜΚΜΝΡΓ & Fr. Pangloss
Current Status: Complete
  • In research, it will then move to budgeting process before implementation
  • Sent to Executive for design approval
  • Budget sent to Executive for approval. --Misskim 11:06, 3 March 2008 (EST)
  • Budget has been approved, all that is needed is the funds and the implementation. I will follow up with Treasurer to find out a timeline. --Misskim 15:18, 2 May 2008 (EDT)
  • Have asked Fr. Zir for consultation on the audio equipment. --Misskim 18:29, 3 July 2008 (EDT)
  • Fr. Zir has given a consultation and :* Fr. ΝΘΛΜΚΜΝΡΓ is working on this. --Misskim 17:01, 12 August 2008 (EDT)
  • Fr. Zir is taking this over and I will work with him now to get this accomplished. --9:42, 13 August 2008 (PST), Fr. אין סוף אור
  • A new mixer and amplified speakers have been purchased and now need to be set up. --Fr. ΝΘΛΜΚΜΝΡΓ 13:37, 4 November 2008 (PST)
  • Fr. ΝΘΛΜΚΜΝΡΓ & Fr. Pangloss has accepted the responsibility of getting the sound system setup prior to the vulgar New Years Eve party. --12:48, 16 December 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


April, 2008 ev

Goal: Continue to improve usefulness and beauty of Kitchen.

Assigned to: Fr. Khabs Kaos
Current Status: Complete
  • Fr. Khabs Kaos has discussed with Br. RW and the current pass-through will come in under budget and will allow for more shelves in the kitchen area. Fr. KK and Sr. AM will plan a field trip to Ikea to discuss further options.
  • Need to research pot hooks for the wall in the kitchen. --15:36, 8 March 2008 (PST), Fr. אין סוף אור
  • I purchased pot hangers for the kitchen and donated them to the Lodge. They need to be hung up in an appropriate place, which I asked Fr. Khabs Kaos to do so that they are in a convenient location. --12:50, 16 December 2008 (PST), Fr. אין סוף אור
  • The pot hangers still need to be mounted, but ultimately this goal is complete. =Goal for 2009 --09:20, 17 December 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


April, 2008 ev

Goal: Manage the painting and hanging of new ceiling banners.

Assigned to: Sr. Aletheia Mnemonicas
Current Status: Complete
  • Some new ceiling banners were recently hung.
  • One more remains to be hung. --Fr. HydraLVX
  • Fr. I0I and I will hang at Lodge Cleaning this Sunday. --Misskim 15:18, 2 May 2008 (EDT)
  • It seems that some additional hanging equipment might be needed to hang the last ceiling banner. --15:28, 6 May 2008 (PST), Fr. אין סוף אור
  • Have equipment, will wait for after the fire inspection and hang.--Misskim 18:29, 3 July 2008 (EDT)
  • Will work with Fr. I0I and get this done ASAP. --Misskim 17:01, 12 August 2008 (EDT)
  • This has been done and undone several times as we have needed to take down the banners for various other projects. 3 banners are now down and need to be put back up. There is difficulty in finding placement for them because of the placement of pipes near the ceiling. --Fr. ΝΘΛΜΚΜΝΡΓ 13:37, 4 November 2008 (PST)

<div style="clear:both;" />


April, 2008 ev

Goal: Ensure that the consumables inventory is continually monitored and stocked.

Assigned to: Sr. Hanashi
Current Status: Complete
  • Sr. Hanashi has a current listing of consumables and will be working to find the best implementation process.
  • Sr. Hanashi has been working on this continually and it appears she has been successful in restocking items.--Misskim 15:18, 2 May 2008 (EDT)
  • I sent Sr. Hanashi a thank you note for continuing to handle this so diligently. If you see her, please thank her as she is the reason we have the things we need in stock. --16:06, 4 August 2008 (PST), Fr. אין סוף אור
  • Sr. Hanashi has done an excellent job ensuring that the consumables for our Lodge have been stocked. I expressed my gratitude to her and asked if she would be kind enough to continue doing this for the Lodge in the coming year. --12:56, 16 December 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


April, 2008 ev

Goal: Quarterly meeting of Facilities Committee Chair with a member of the Executive to facilitate ease of management and delegation.

Assigned to: Fr. אין סוף אור
Current Status: Complete
  • Need to schedule first quarterly meeting soon. --Fr. אין סוף אור
  • The first meeting has been held and it has been decided that we do not need any further meetings. Simple email check-ins should suffice. --15:30, 6 May 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


April, 2008 ev

Goal: Assign inspector at each lodge cleaning to ensure quality cleaning and maintenance work is done.

Assigned to: Fr. אין סוף אור
Current Status: Complete
  • Need to determine if there is somebody who regularly shows up for lodge cleaning and is detail oriented so-as to be a good fit for this. The other potential option is to choose somebody each time at the beginning of lodge cleaning. --Fr. אין סוף אור
  • It has been determined that it is best that I handle this regularly since I show up at every lodge cleaning and know what needs to be done. -- 13:17, 6 November 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


Sept, 2008 ev

Goal: Posting reminder for Lodge Cleaning and include Lost & Found reminder each month.

Assigned to: Fr. אין סוף אור
Current Status: Ongoing
  • This has been getting done regularly. Lost & Found is currently clear. --15:39, 6 May 2008 (PST), Fr. אין סוף אור
  • The monthly lodge cleaning reminders have been sent out regularly, however I have come to the conclusion that we should cease to send out such reminders in the future. This will be up for discussion at some point. The lost & found has been repeatedly cleared as well. --08:25, 20 December 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


Sept, 2008 ev

Goal: Design and schedule quarterly cleaning of clutter from the lodge by the “Clutter Queens”

Assigned to: Sr. Aletheia Mnemonicas
Current Status: Complete

Timeline implemented:

  • December 1
    • Done. Made listing of items in lodge to be replaced to provide for more efficient use of space and aesthetic.
  • March 1
    • Done. Replaced coffee mugs with matching set. Cleaned out general use closet of excess materials. Plan for next time, clean out loft. --Misskim 11:06, 3 March 2008 (EST)
  • June 7
    • Done. Removed excess junk from loft and completely cleaned the general use closet with the help of Fr. אין סוף אור and Fr. I0I--Misskim 18:29, 3 July 2008 (EDT)
  • Sept 6
    • Done. Cleared out a few extra items around the lodge. --Misskim 17:13, 1 October 2008 (PDT)
    • Having cleaned once each quarter this year, this goal is considered accomplished.--Misskim 17:13, 1 October 2008 (PDT)

<div style="clear:both;" />


Sept, 2008 ev

Goal: Inspect and maintain facility for needed maintenance on monthly basis.

Assigned to: Fr. IOI
Current Status: Complete
  • Fr. IOI has a schedule for checking maintenance and will report all items in need of work to Fr. אין סוף אור.
  • Wood flooring under carpet needs to be repaired as it is lifting up. =Goal for 2009 ev
  • One of the latches on the windows needs to be fixed.
  • Battery for clock needs to be replaced. I purchased batteries today and will replace them tonight. --16:10, 15, April 2008 (PST), Fr. אין סוף אור
  • I used some industrial strength glue to glue the velcro back onto the red mass curtains where needed. I also bought more batteries for the clocks and replaced the batteries for the clock in the kitchen. There is a request to acquire a new clock for the one in the classroom because it seems to be broken. I'm also doing research (with some help) on how to fix the latch for the second window in the classroom. --09:44, 5 July 2008 (PST), Fr. אין סוף אור
  • The antique family heirloom that was donated by Sr. Liz was hung in the temple by Fr. John and is a great addition. --16:08, 4 August 2008 (PST), Fr. אין סוף אור
  • One of the benches in the Temple has a small tear on one side and could use patching. --Geoff 16:27, 6 September 2008 (EDT)
  • The fire extinguisher in the temple needs to be re-hung. The holder is upside down. --Geoff 13:59, 14 September 2008 (PDT)
  • The handle to the window in classroom needs to be tightened. --Geoff 13:59, 14 September 2008 (PDT)
  • The veils around the altar are hanging unevenly and one hanging loop is coming apart at the seam. Veils need to be adjusted, cables may need tightening and veils need to be repaired. --Fr. ΝΘΛΜΚΜΝΡΓ 13:37, 4 November 2008 (PST)
  • "Curtains" which hide the folding chairs are in need of a better method of closure. The velcro strips have continued to peel off. They could potentially be sewn on. =Goal for 2009 ev --Fr. ΝΘΛΜΚΜΝΡΓ 13:37, 4 November 2008 (PST)
  • 2nd desk in office could be replaced with cubbyholes or some more efficient use of space. Consider possibilities and draft goal for next year. =Goal for 2009 --Fr. ΝΘΛΜΚΜΝΡΓ 13:37, 4 November 2008 (PST)
  • Sacristy, general use closet, and area behind curtains are badly in need of tidying. We may need more shelving/storage space to put things, as the table in the sacristy continues to accumulate things. =Goal for 2009 ev --Fr. ΝΘΛΜΚΜΝΡΓ 13:37, 4 November 2008 (PST)
  • Need metal carpet trim to prevent tripping and fraying of the carpet. =Goal for 2009 ev --Sr. Morgana 12:15, 6 November 2008 (PDT)
  • Several of these tasks encompass larger project work and will turn into goals for next year. The tear on the bench has been patched. The veils around the altar were taken down and checked but found that it was not coming apart, it just looked like it was from some fraying. Metal carpet trim has been purchased and will be at the Lodge in the near future to be put in place. In addition, it has been discussed and decided that this monthly check of needed maintenance will be performed during the monthly Lodge cleaning to make this more routine. --09:25, 17 December 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


Sept, 2008 ev

Goal: Appoint a green inspector to propose changes to make the Lodge more environmentally friendly.

Assigned to: Fr. Pangloss
Current Status: Complete
  • New energy saving light bulbs are being purchased. --Fr. אין סוף אור
  • Bulbs have been purchased and given to Fr. אין סוף אור . --Misskim 11:06, 3 March 2008 (EST)
  • Old bulbs were replaced with energy saving bulbs where they fit properly. Some bulbs did not fit where anticipated. --12:46, 04 April 2008 (PST), Fr. אין סוף אור
  • I asked a friend of the lodge, who is very keen to be green, to make an assessment of what needs to be done for us to get more environmentally friendly. She has taken an assessment and I'm waiting on the suggestions. --15:42, 6 May 2008 (PST), Fr. אין סוף אור
  • Compiled itemized list of points to address, principally focused on replacing existing toxic materials used for cleaning and such with non- or less-toxic substitutes and identifying ways of reducing energy usage. --Pangloss 2008-08-19
  • Temperature of water heater reduced to a more conservative level. --Pangloss ☉ ♐ : ☽ ♉ : dies ♂ : anno IVxvi
  • All this work has been happening under the leadership of our green inspector, Fr. Pangloss, has it not? --Fr. ΝΘΛΜΚΜΝΡΓ 21:09, 16 December 2008 (PST)
  • The weather-proofing still needs to be done and the list of new cleaning supplies added to our list of consumables, however, this is complete as far as the specifics of the goal being that Fr. Pangloss has taken on the duty of being our green inspector. --08:37, 17 December 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


April, 2008 ev

Goal: Create facilities budget 2008.

Assigned to: Fr. אין סוף אור (reassigned as new Chair)
Current Status: Complete
  • In process, need to collate numbers and recheck.
  • Consumables numbers collated from last year's numbers, all special project budgets will come as we begin implementation, considered complete.
  • I was informed that this has been completed already. --15:40, 8 March 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


April, 2008 ev

Goal: Touch up red paint on temple electrical outlets and curtains (and/or pin them together)

Assigned to: Fr. אין סוף אור
Current Status: Complete
  • One coating of paint touch up has happened, including fixing/painting the new damage done to the wall due to the falling partition. Research is being done on the best way to velcro/fix the curtains together.
  • Project of touch up for black paint sent to Fr. אין סוף אור on 1/28/08.
  • Purchased black paint and new paint brush. --Fr. אין סוף אור
  • I was informed that this has been completed already. --15:42, 8 March 2008 (PST), Fr. אין סוף אור

<div style="clear:both;" />


April, 2008 ev

Goal: Shave off part of southern temple/classroom door so that it closes smoothly.

Assigned to: David
Current Status: Complete

<div style="clear:both;" />


Goal: Finish painting exterior with stencils.

Assigned to: Fr. ΝΘΛΜΚΜΝΡΓ
Current Status: Goal for 2009 ev
  • Door stencils are finished. --Misskim 11:06, 3 March 2008 (EST)
  • Next Step: Aquire OTO lamen stencil for bay doors.
  • We have another possibility to get these done very inexpensively by a friend of the Lodge who has skill and experience with making stencils. --Fr. ΝΘΛΜΚΜΝΡΓ 17:59, 6 September 2008 (PDT)
  • Having a second option, and subsequent discussion, for the stencils has caused delay in getting this done. Handmade stencil would be more difficult to put on (including potentially removing the bay doors for horizontal painting), which defeats the original purpose of having stencils that can be easily re-painted if/when we are tagged. This brought up the suggestion to put a layer of lacquer on top, that we could just sand off & re-lacquer when we get tagged. All fine and dandy, but now we are in the rainy season and nothing has been done. Need to discuss options with Fr. אין סוף אור and get the ball moving again. --Fr. ΝΘΛΜΚΜΝΡΓ 13:37, 4 November 2008 (PST)
  • We are going back to the original plan. This will be done in early 2009 ev. --Fr. ΝΘΛΜΚΜΝΡΓ 21:09, 16 December 2008 (PST)


Goal: Acquire Fire Altar

Assigned to: Fr. I0I
Current Status: Stalled
  • Currently in discussions with craftsman. --[[User:Gleibinger|Geoff]
  • Working out scheduling. --Geoff 16:27, 6 September 2008 (EDT)
  • Due to budget constraints this project will not be accomplished this year. --13:21, 16 December 2008 (PST), Fr. אין סוף אור